
Get a free quote
We reply with a price. Nothing is booked until you say yes.
Rather talk? Call (815) 420-4652 or text us.
Short answer
Want a price on electrical panel upgrade?
Call, text, or send the form. You get a written price back before any work is scheduled.
Panel replacement or service upgrade?
They get called the same thing, but they are different jobs. A panel replacement swaps the breaker box and breakers while the house keeps the same size service from ComEd. A service upgrade raises the amperage the house can draw, usually from 100 to 200 amps, which means a new meter base, new service-entrance conductors (the mast on the outside wall or an underground lateral), new grounding, and a new panel. The second costs more because more of it is outside and because the utility is involved. ComEd's 2022 study of home electrification put typical costs at about $1,000 for a replacement panel without a service upgrade and $4,000 to $6,000 for an amperage upgrade (ComEd study).
Rockford houses that usually need one
The median home in the City of Rockford was built in 1963, and 46.5% of its 67,423 housing units went up before 1960 (Census Bureau). Houses that age were built with 60-amp services or fuse boxes and, if they were updated in the 1960s or 1970s, often got a 100-amp panel. That is enough for lights and a gas furnace, and tight once you add central air, an electric dryer and range, a hot tub, a heat pump or an EV charger. The usual signs are breakers that trip when two big loads run together, a panel with no open spaces and tandem breakers squeezed in, warm breakers, a fuse box, or a Federal Pacific or Zinsco panel. The full list is in signs you need a panel upgrade.
What Rockford's code adds
Rockford adopted the 2020 National Electrical Code with local amendments for permits filed on or after December 31, 2024 (City of Rockford amendments). Three things in that package shape a panel job here:
- The whole service comes up to code. When any part of a service is replaced, the rest has to meet the current code too, so a new panel on an old mast can mean a new mast.
- Disconnect location. The service disconnect has to be outside or within 5 feet of the meter enclosure, which moves some basement panels or adds an outdoor disconnect.
- Metal conduit outside. Overhead service entrances run in rigid or intermediate metal conduit, and underground services in galvanized conduit.
The 2020 NEC itself adds two dwelling rules that older Rockford panels never had: a surge-protective device on every service (section 230.67) and an emergency disconnect outside one- and two-family homes (section 230.85) (IAEI). Loves Park, Machesney Park and Belvidere have the same regional amendments, and Loves Park and Machesney Park also require a main panel of at least 16 spaces on service work.
ComEd's part of the job
ComEd owns the service drop and the meter; the homeowner owns everything from the attachment point in, including the meter base, mast and service wires (ComEd Blue Book). Only meter sockets labeled "CECHA" are approved in ComEd territory. Upgrades are requested through ComEd's Service Installation and Upgrades Portal, and ComEd requires its own approval in addition to the city's inspection before it reconnects (ComEd service requests). Electricians in ComEd's study reported about a 4 weeks wait for a disconnect and reconnect on overhead service, so plan the job around that date, not the electrician's.
Permit, inspection and how long you are without power
In Rockford the permit is posted where it can be seen from the street before work starts, and the electrician calls for inspections at least one full business day ahead: the service inspection after the service is installed, then the final (City of Rockford). The city's 2026 fee schedule charges residential replacement work 0.55% of the job's reported value plus a $50 processing fee and a 10% technology surcharge, so the permit on a typical panel job is under a hundred dollars (2026 fee schedule). The power is usually off for most of one day while the old panel comes out and the new one goes in.
Sources: City of Rockford, Electrical Permits; City of Rockford, Local Amendments to the 2020 NEC; City of Rockford, 2026 Fee Schedule; ComEd, Blue Book: Consumer's guide to electric service (2026); ComEd, Service requests (Service Installation and Upgrades Portal); ComEd, Home infrastructure upgrades to enable residential electrification (2022); ComEd, Service and Meter Requirements; IAEI Magazine, Residential changes for the 2020 NEC; City of Loves Park, Ord. 4678-25 (2020 NEC); CPSC, 1983 release closing the FPE circuit breaker investigation (revised 2011); U.S. Census Bureau, ACS 2020-2024 5-year, via Census Reporter; National electrician cost guides (2026 data)
Where this is done
Electrical Panel Upgrade in Rockford and the towns around it. Each town page has its own housing age, permit office and code edition; the rest are on the service area page.
Common questions
Electrical Panel Upgrade: questions
How much does a panel upgrade cost in Rockford?
No Rockford price data is published. Typical U.S. ranges are $1,500 to $4,000 for a 200-amp panel replacement and $2,500 to $6,000 for a 100 to 200 amp service upgrade; ComEd's 2022 study of local jobs put upgrades at $4,000 to $6,000. See the cost page.
Do I need a permit to replace an electrical panel in Rockford?
A permit is required. Rockford requires an electrical permit to install, alter, repair or replace electrical systems, and only like-for-like breaker, switch, outlet and light swaps are exempt. The permit must be posted before work starts. See Rockford electrical permits.
How long does ComEd take to reconnect after a service upgrade?
ComEd asks for at least two weeks' notice to connect an overhead service drop, and electricians in its 2022 study reported waits of about 4 weeks for a disconnect and reconnect. The request goes through ComEd's Service Installation and Upgrades Portal.
Is 100-amp service enough for a house?
It can be for a small house with gas heat, a gas range and dryer. It gets tight with central air, electric cooking or drying, a hot tub, a heat pump or an EV charger. A load calculation from the electrician answers it for your house.
Should I replace a Federal Pacific or Zinsco panel?
Many electricians and home inspectors recommend it. The CPSC closed its Federal Pacific Stab-Lok investigation in 1983 without finding enough data to call the breakers a serious risk, and it did not clear them either. See Federal Pacific, Zinsco and fuse boxes.
Does a new panel need a surge protector in Rockford?
Rockford, Loves Park, Machesney Park and Belvidere are on the 2020 NEC, which requires a surge-protective device on services supplying dwelling units. A whole-house surge protector runs about $300 to $900 in national guides.
Can a homeowner replace their own panel in Rockford?
Rockford lets an owner do electrical work in the single-family home they live in, with a permit, and says any helper must be a Rockford-registered electrician. ComEd still has to disconnect and reconnect the service.
Other services
- Electrical repairsDead outlets, tripping breakers, flickering lights and warm switches, found and fixed.
- Emergency electricianSparking, burning smells, storm-damaged meters and power out to part of the house.
- EV charger installationLevel 2 chargers, the panel check and ComEd's rebate.
- GeneratorsStandby generators and portable generator interlocks.
- Lighting and ceiling fansRecessed lights, fixtures, outdoor lighting and fans.
- Outlets and GFCINew outlets, GFCI protection, 240-volt outlets and circuits.
- Knob-and-tube replacementOld cloth and porcelain wiring replaced in older houses.
- Whole-house rewiringFull rewires for older houses and major remodels.
- Commercial electricianShops, offices and small commercial buildings.
Electrical Panel Upgrade around Rockford
Tell us what you need and roughly how old the house is. We reply with a written price, and nothing starts until you agree to it.
