Short answer
1. Describe the job
What you need, roughly how old the house is, and a photo of the panel with the door open. The panel label and main breaker tell an electrician the brand and the service size, which decides most of what a panel, charger or circuit job involves.
2. Look and load check
For anything that adds load, like an EV charger, a heat pump, a hot tub or a finished basement, the electrician checks the service size and the existing load. For repairs, troubleshooting finds the cause: a failed breaker, a loose connection, a bad device, a damaged cable.
3. Written price and scope
We sends what is being installed or repaired, what is not included, whether the price is flat or hourly, and whether the permit and any ComEd coordination are in it. Nothing starts until you agree.
4. Permit
In Rockford the registered electrician pulls the permit, and it is posted where it can be seen from the street before work begins. Like-for-like swaps of outlets, switches, fixtures, small fans and breakers are exempt; anything else needs one.
5. Rough-in and inspection
New wiring goes in and the city inspects it before walls, ceilings or soffits are closed. Underground runs are inspected before backfill, and a new service is inspected once it is installed. Inspections are requested at least one full business day ahead.
6. ComEd, on service work
For a panel or service upgrade, ComEd disconnects and reconnects the meter. The request goes through ComEd's Service Installation and Upgrades Portal, and ComEd needs its own approval as well as the city inspection before it reconnects.
7. Final inspection and walk-through
The city does a final inspection. You should see the panel directory labeled, the permit closed, and anything new (GFCI and AFCI devices, a surge protector, a charger) explained.
Why the permit is worth having
The inspection is the only independent look the wiring gets before it disappears behind drywall. It also leaves a record that buyers, home inspectors and insurers ask for. Rockford says work started without a permit faces a fine substantially larger than the permit itself. The rules, exemptions and fees are in Rockford electrical permits.
Older houses take a little longer
Plaster walls, old cloth-covered wiring and small services are common in Rockford, where the median home was built in 1963. Opening a wall in a house that age can turn up wiring that has to be fixed before anything new connects to it, and a good written price says how that will be handled. Prices for every common job are on the electrician cost page, and every service is on the electrician Rockford IL homepage.
Sources: City of Rockford, Electrical Permits; City of Rockford, Construction FAQs (permit exemptions, homeowner work); City of Rockford, 2026 Fee Schedule; ComEd, Service requests (Service Installation and Upgrades Portal); ComEd, Blue Book: Consumer's guide to electric service (2026); U.S. Census Bureau, ACS 2020-2024 5-year, via Census Reporter
Process questions
How long does an electrical permit take in Rockford?
Simple residential permits can be issued quickly; larger jobs that need construction documents take plan review. Inspections are requested at least one full business day or 24 hours ahead.
Do I need to be home for the inspection?
Someone usually has to let the inspector in for interior work. Outdoor service inspections may not need you there. Ask the electrician, who schedules it.
How long will the power be off?
For most repairs and new circuits, only the circuit being worked on. For a panel change, usually most of one day. For a service upgrade, from the ComEd disconnect until the reconnect after inspection.
What happens if the work fails inspection?
The inspector lists what to correct, the electrician fixes it, and a re-inspection is scheduled. Rockford charges a fee for re-inspections of faulty or incomplete work.
Does the electrician or ComEd install the meter?
ComEd furnishes and installs the meter and the service drop. The homeowner's electrician installs the meter socket, mast or lateral and the panel.