Get a free quote
We reply with a price. Nothing is booked until you say yes.
Rather talk? Call (815) 420-4652 or text us.
Short answer
Want a number for your own house?
Send what you need done and a photo of your panel. We reply with a written scope and price before anything is booked.
Repairs and small jobs
Electrician prices for small jobs
Small jobs are usually priced flat, on top of a service call that often covers the first hour. Several in one visit cost less each, because the trip is paid once. Each range spans what 2026 national cost guides give for the job.
| Job | Typical U.S. range | What moves the price |
|---|---|---|
| Service call or trip fee | $100 to $200 | Often covers the first hour; some credit it toward the repair. |
| Replace an outlet or switch | $100 to $300 | Less each when several are done in one visit. |
| GFCI outlet | $125 to $400 | Kitchens, baths, basements, garages, outdoors, laundry. |
| 240-volt dryer or range outlet | $300 to $700 | Distance from the panel and a free breaker space drive it. |
| New dedicated 20-amp circuit | $300 to $900 | Microwave, space heater, freezer, a home office. |
| Light fixture on an existing box | $150 to $450 | Basic fixture low, chandeliers and high ceilings high. |
| Recessed light, per fixture | $125 to $400 | Per can; six or more in one room cost less each. |
| Ceiling fan | $150 to $600 | A fan-rated box already in place is the low end; a new box and wiring run $350 to $700. |
| Hardwired smoke alarm, each | $100 to $200 | Interconnected alarms cost more than single ones. |
| Whole-house surge protector | $300 to $900 | Required on new and replaced services under the 2020 NEC. |
| Hourly rate (troubleshooting, repairs) | $50 to $130 | After hours, weekends and holidays run about $150 to $200 an hour. |
Source: National electrician cost guides (2026 data)
Panels, chargers, generators, rewiring
Electrician prices for big jobs
Big jobs are quoted as a project. They are where Rockford's older housing, the city's code amendments and ComEd's schedule change the number most.
| Job | Typical U.S. range | What it includes |
|---|---|---|
| Panel replacement, 200 amp | $1,500 to $4,000 | Same service size, new breaker panel and breakers. |
| Service upgrade, 100 to 200 amp | $2,500 to $6,000 | New meter base, mast or lateral, panel, grounding, ComEd disconnect and reconnect. |
| Level 2 EV charger, panel has room | $800 to $2,500 | Charger hardware plus a 240-volt circuit; longer runs cost more. |
| EV charger plus a 200-amp upgrade | $4,500 to $7,500 | When the existing service can't carry the charger. |
| Portable generator inlet with interlock or transfer switch | $400 to $1,600 | Lets a portable generator feed chosen circuits without backfeeding the grid. |
| Standby generator, installed | $6,000 to $15,000 | Unit, automatic transfer switch, pad, gas line; over 20 kW or long runs cost more. |
| Whole-house rewire | $8,000 to $30,000 | About $5 to $17 per square foot; plaster walls and finished basements add cost. |
Source: National electrician cost guides (2026 data)
One local check on those numbers comes from ComEd itself. Its 2022 study of home electrification asked electricians in its territory about real jobs and put typical costs at about $4,000 to $6,000 for an amperage service upgrade, $1,000 for a replacement panel without a service upgrade, and $400 for a new dedicated circuit (ComEd study). The same electricians reported about a 4 weeks wait for ComEd to disconnect and reconnect an overhead service, which is time, not money, but it sets the schedule.
Inside the big numbers
What each big electrical job includes
Panel replacement ($1,500 to $4,000)
A new breaker panel and breakers on the same size service: the old panel comes out, circuits are moved over and labeled, and AFCI or GFCI breakers go where the current code wants them on the circuits being touched. On a Federal Pacific, Zinsco or fuse-box house this is the most common job. Expect the power off for most of a day. In Loves Park and Machesney Park a main panel on service work has to have at least 16 spaces, and Belvidere bans tandem breakers in new panels.
Service upgrade, 100 to 200 amps ($2,500 to $6,000)
Everything in a panel replacement plus a new meter socket, new service-entrance conductors in a mast or underground lateral, new grounding and bonding, and coordination with ComEd, which owns the drop and the meter. Rockford's amendments add metal conduit on overhead entrances and a disconnect outside or within 5 feet of the meter, and the 2020 NEC adds a surge protector and an outdoor emergency disconnect. The ComEd wait, not the electrician's day of work, usually sets the date.
Level 2 EV charger ($800 to $2,500)
A 240-volt circuit sized to the charger, the charger or a 14-50 outlet, the permit and inspection. The range is mostly distance: next to the panel in an attached garage is the low end; a detached garage or an outdoor post is the high end. If the load calculation says the service can't carry it, the job becomes $4,500 to $7,500 with an upgrade. ComEd's rebate comes off the invoice when a network installer does the work.
Generator hookup ($400 to $1,600) or standby generator ($6,000 to $15,000)
The inlet-and-interlock route covers an inlet box, a cord, and an interlock kit or manual transfer switch at the panel, so a portable generator can run chosen circuits. The standby route adds the generator, a pad, an automatic transfer switch and a gas line, which a plumber or gas fitter permits separately. Bigger units and long gas or wire runs go above the range.
Whole-house rewire ($8,000 to $30,000)
New cable to every outlet, switch and light, new boxes where the old ones are too small, GFCI and AFCI protection, and patching the openings. It is priced mostly by square footage and how easy the walls are to fish: plaster and lath, finished basements and finished attics cost more than drywall over an open basement.
Hourly or flat
When you pay by the hour and when you pay a flat price
Troubleshooting is usually hourly, because nobody knows the cause until it is found: a circuit that went dead, a breaker that trips at random, flickering that comes and goes. Once the cause is known, the fix is often quoted flat. Defined jobs like an outlet, a GFCI, a fan or a new circuit are usually flat-priced from the start, and projects are quoted as a whole. Ask which one a quote is, and what happens if something unexpected turns up in the wall.
Emergency calls at night or on a weekend cost more, about $150 to $200 an hour. If nothing is hot, smoking, sparking or wet and the rest of the house has power, turning off the affected breaker and booking a daytime visit usually costs less.
Rewiring by size
Whole-house rewire cost by home size
Rewiring is priced mostly by square footage and access. A whole house runs about $5 to $17 per square foot, and replacing knob-and-tube $8 to $17. Plaster and lath walls, finished basements and a new service at the same time push toward the top. See knob-and-tube wiring replacement.
| Home size | Typical U.S. rewire cost |
|---|---|
| Up to 1,000 sq ft | $4,000 to $10,000 |
| About 1,500 sq ft | $6,000 to $15,000 |
| About 2,000 sq ft | $8,000 to $20,000 |
| 3,000 sq ft and up | $12,000 to $30,000 |
Source: National electrician cost guides (2026 data)
Local costs
What permits add around Rockford
Permit fees are small next to the job, but they differ by town. These come from each town's own schedule, with its date.
| Where | Electrical permit fee | Schedule |
|---|---|---|
| City of Rockford | 0.55% of reported job value (residential), plus $50 processing and a 10% surcharge | 2026 fee schedule |
| Loves Park | $40 processing; service up to 200 A $30; residential wiring $82 to $110 by size | Effective Feb. 15, 2018 |
| Machesney Park | $40 per trade; service up to 200 A $25; panel $12; small jobs $25 flat | Revised Sept. 6, 2023 |
| Belvidere | Service 101 to 200 A $30 inspection; $25 minimum per permit; plus base permit fee | Code handout, Sept. 2023 |
| Winnebago County (Roscoe, Rockton, Cherry Valley, unincorporated) | $40 per trade; small residential wiring $25 flat; residential wiring $82 to $110 up to 2,000 sq ft | Adopted Aug. 11, 2016 |
Sources: City of Rockford, 2026 Fee Schedule; City of Loves Park, Building Division; Village of Machesney Park, Building codes; City of Belvidere, Article III Electricity; Winnebago County, Building fee schedule
Work started without a permit costs more: Loves Park doubles the fee with a $250 minimum, and Rockford's registration form sets a $250 minimum fine for a first no-permit offense. Every town's full rules are on its town page.
Rockford factors
What pushes a Rockford quote up
- Old houses. The median Rockford home was built in 1963 and 46.5% predate 1960 (Census). Plaster, cloth-covered wire and fuse boxes take longer to work around.
- The whole-service rule. Rockford's 2020 NEC amendments require the whole service to meet current code once any part is replaced (City of Rockford), so a meter-base repair can become a new mast.
- 2020 code items. A surge protector ($300 to $900) and an outdoor emergency disconnect on service work.
- Detached garages. Common on older lots; a charger or subpanel there needs a feeder or a trench.
- Distance and access. The farther from the panel and the more finished the ceilings, the more labor.
Ways to pay less
What brings it down
- ComEd's EV charger rebate: up to $750, or $2,500 income-qualified, for 2027 applications, through a ComEd-network installer (ComEd). See Illinois EV charger rebates.
- Bundling. One trip for five outlets, a fan and a GFCI costs less than three visits.
- Doing it with other work. Rewiring while walls are open for a remodel saves most of the patching.
- A load calculation first. Sometimes it shows a charger fits without a service upgrade.
- Ready on inspection day. Re-inspections carry their own fee in Rockford and the nearby towns.
Getting an accurate quote
How to compare electrician quotes
Lay the written scopes side by side and check the same things in each: who pulls the permit and whether the fee is included; the panel brand and number of spaces; whether a surge protector and outdoor disconnect are in a service job; who coordinates with ComEd; how patching is handled; and whether the price is flat or hourly. A quote that is far below the others usually leaves one of those out. The electrician should give you a Rockford registration number, since it has to be on the permit (City of Rockford). More on hiring in how to find an electrician in Rockford.
Why the hourly rate is higher than what electricians earn: the Bureau of Labor Statistics puts the Rockford-area median wage at $44.85 an hour (BLS), and the billed rate also covers the truck, insurance, tools, permits and drive time.
Common questions
Electrician cost questions from Rockford
How much does an electrician cost in Rockford, IL?
No Rockford or Illinois price data is published. Typical U.S. rates are $50 to $130 an hour plus a $100 to $200 service call; small jobs like an outlet run $100 to $300, and big ones like a 200-amp panel $1,500 to $4,000.
How much does an electrician charge per hour in Illinois?
No Illinois billing survey exists. Typical U.S. rates run $50 to $130, with $150 to $200 after hours. Illinois electricians earn a median $47.87 an hour and Rockford-area electricians $44.85 (BLS, May 2025). See electrician hourly rates in Illinois.
How much does it cost to upgrade from 100 to 200 amps?
About $2,500 to $6,000 in 2026 national guides. ComEd's 2022 study of local jobs put it at $4,000 to $6,000. The meter base, mast or lateral, panel, grounding and ComEd's disconnect and reconnect are all part of it. See electrical panel upgrade.
How much does an EV charger cost to install?
About $800 to $2,500 when the panel has room and $4,500 to $7,500 when a 200-amp upgrade is needed. ComEd's rebate takes off up to $750, or $2,500 income-qualified, for 2027 applications.
How much does it cost to rewire a house?
$8,000 to $30,000 for a whole house in national guides, about $5 to $17 per square foot; knob-and-tube replacement runs $8 to $17 per square foot.
How much is an electrical permit in Rockford?
0.55% of the job's reported value for residential work, plus a $50 processing fee and a 10% surcharge (2026 schedule). On a typical panel job that is well under a hundred dollars. See Rockford electrical permits.
Why do electrical quotes vary so much?
Scope. One quote may include the permit, a surge protector, bringing the service up to code and patching; another may leave all of that out. Compare what each written scope includes, not just the total.
Is it cheaper to do electrical work myself?
Rockford lets an owner do electrical work in the single-family home they live in, with a permit and inspections, and any helper must be a Rockford-registered electrician. Service work still needs ComEd, and mistakes behind a wall are expensive to find later.
Get a written price
Rockford, Loves Park, Machesney Park, Belvidere, Roscoe, Rockton and Cherry Valley. Tell us what you need done and we reply with a price before anything is booked.